Footings have been installed, bents cut to length and
the cross bracing installed

Drip plates were fabricated to cover the bolt holes
which is prototypical. The bents are set with some temporary bracing.

Stringers are installed and track panels laid on top.

Out of rail, joiners, hardware and time construction
ended here in 2006.