Footings have been installed, bents cut to length and the cross bracing installed

 

Drip plates were fabricated to cover the bolt holes which is prototypical. The bents are set with some temporary bracing.

 

Stringers are installed and track panels laid on top.

 

Out of rail, joiners, hardware and time construction ended here in 2006.

 

Home